Well a lot has happened since my last blog update. Where to begin...
The plumbing for your new locker rooms, water cooler, and washer and dryer is complete. The ceiling and walls in the main gym area has been primed and painted! It looks fabulous.. Vanities in the upstairs bathrooms have been replaced. The electrical and HVAC work in the PT and office area is done. All the offices and hallways have been painted. 4 showers have been installed. 2 new steel roll up garage doors have been ordered. The stone wall outside of the building has been power washed. We are meeting with a branding team later this week to design our new logo and we have formulated a wish list for our new equipment... Which will be left a surprise.. Some things must be kept a secret..
Keep checking the blog for more updates and pictures to come very soon..
The plumbing for your new locker rooms, water cooler, and washer and dryer is complete. The ceiling and walls in the main gym area has been primed and painted! It looks fabulous.. Vanities in the upstairs bathrooms have been replaced. The electrical and HVAC work in the PT and office area is done. All the offices and hallways have been painted. 4 showers have been installed. 2 new steel roll up garage doors have been ordered. The stone wall outside of the building has been power washed. We are meeting with a branding team later this week to design our new logo and we have formulated a wish list for our new equipment... Which will be left a surprise.. Some things must be kept a secret..
Keep checking the blog for more updates and pictures to come very soon..
Labels: construction




0 Comments:
Post a Comment
<< Home